Inauguration of the new storage installation for CLH in the Port of Bilbao

CLH, the petroleum products transport and storage company, inaugurated a new hydrocarbon storage installation on Wednesday 16 December in the Port of Bilbao, in the presence of the leader of the Basque Region (“lehendakari”) Iñigo Urkullu, and for which NERVIÓN Industries was one of the key companies in the construction. This Plant represents an investment of 18.2 million euros for the company. This new plant has 8 tanks, 4 of which have been built by NERVIÓN Industries and they have a storage capacity of 123,000 cubic metres. A second phase with three tanks of 38,000 cubic metres, which will provide capacity of 114,000 cubic metres, is also envisaged, and in the meantime  NERVIÓN Industries, through its “Storage Tanks” division, has carried out the design, engineering, construction and installation of the 4 first-phase tanks with dimensions of 27 metres diameter and 25 metres height, giving the client all the service and professionalism of our technical team, by supervising and guaranteeing the work quality and planning required.